Retrofitting is the most common form of today's installation.
Meeting fixed dimensions and adapting to existing pipelines are factors we deal
with on a regular basis when designing a PVS-1000 Station. Although the
new design may be limited to meet existing aspects, the efficiency and
dependability of the new system is unquestionable.
The best possible way to design a PVS-1000 Station is from the very beginning
as a New Install. As a brand new install, the design has more
freedom to be as compact as possible and to be located in more convenient areas
not commonly used.