Preparation - Basic Steps

Clarke Sales / Backflow Prevention Device Tester

P.O Box 220114 Newhall Ca 91322

Design

Integrity

27899 Smyth Drive, Valencia Ca 91355

Phone (661) 294-0901  Fax (661) 294-1175

Assurance

Call Today For Your Free Consultation

Where Innovative Minds Meet Real World Needs

Home
Up
Reg Stations
LAUSD C-516
PVS-1000 Install
PVS-1000 Maint & Rep
Catalogs / Manuals
Contact Us
Job Photos

Step Description
1 Ensure that water service can be shut off
2 Remove any old equipment or piping from the system
3 Prepare the inlet and outlet stub-ups in accordance with the dimensions on the approved shop drawing supplied with your order.
4 Ensure that stub-up flanges are smooth, flat and aligned properly
5 Ensure that stub up center-line dimensions are within 1/4" of the approved shop drawing supplied with your order
6 Ensure that the stub-up flanges are level and are parallel with each other within AWWA Standards
7 Make sure that the flow direction is easily identifiable.
8 Take your meter reading just before installation.

 


 

Questions or problems regarding this web site should be directed to clarkesales@sbcglobal.net.
Copyright © 2002 Clarke Sales. All rights reserved.
Last modified: 08/24/06.